- Front Door - Hume Newington (Jasper colour, but thinking of stripping that and staining it)

- Internal Doors - Moulded Panel HAG9 (Stainless steel terrace door handles)

- Kitchen Cupboards / Bathroon Vanities - Mocha Velour

- Kitchen cupboard handles

- Kitchen / Laundry bench top - Cocoa Sand

- Laundry cupboards - warm white
- Tap range - Caroma Irwell Metro
- Shower Heads - Caroma Dorf Nutra On-rail

- Internal Paint colour - Taubmans swirling mist
- Carpet - Racecourse Sandown (brown tones)
Just running commentry on the build of our home, from start to finish.
Saturday, September 17, 2011
Interior colour selections
Admittadly these selections were chosen quite some time ago now, however we noticed they weren't on the blog, so better late then never right?
Slow and steady wins the race
We've had a very slow couple of weeks with council hold ups (if only the builder did it right in the first place). In the mean time, we were told by the tile supplier that our bathroom floor tile and mosaic was discontinued, so we had to go back and re-select some of our tiles for the house. Along with the 2 sets of tiles, we also changed our patio/alfresco tile from white to grey, mainly because we have decided to go with a dark colour driveway to match our dark roof, so we figure we'll match the patio to it all, plus the fact that the white will get absolutely filthy very quickly.
Throughout the process so far, we've been trying to stay on top of things by getting certain items along the way for when we're ready to move in. For example:
Throughout the process so far, we've been trying to stay on top of things by getting certain items along the way for when we're ready to move in. For example:
- We've decided to go with a mirrored splash back in the kitchen to make the space feel larger. Getting quotes for this at the moment.
- We've purchased our kitchen tap:

- Our front up/down lights: (Went with a square light as our front door handle is of the same shape, the omni trilock)

- Our front hallway light:

- Our Theatre Light:

Sunday, September 4, 2011
How shocking
Twas an interesting week on the Durham homestead site. Had the roof tiles and the ridge capping completed at the beginning of the week which was exciting to see. Got told that the electrical rough in was booked in for the end of the week which stirred the pot a bit (in a good way). Had to meet the electrician on site to go through some last minute changes of placement and at the same time ran into the site supervisor. I love running into the site supervisor. The man always gives me good and uplifting news!
The Brick cleaners were booked in for friday, the roof rail was coming down, and the insulation is to be done next week with the gyprock to be fitted the week after. Come saturday morning, the roof rails were indeed removed, the bricks inside the garage were sparkling clean and there is now webs of electrical wire everywhere.
Can't wait for next weekend when our house turns yellow with insulation installed!
The Brick cleaners were booked in for friday, the roof rail was coming down, and the insulation is to be done next week with the gyprock to be fitted the week after. Come saturday morning, the roof rails were indeed removed, the bricks inside the garage were sparkling clean and there is now webs of electrical wire everywhere.
Can't wait for next weekend when our house turns yellow with insulation installed!
Friday, August 26, 2011
The roof, The roof, The roof is on..... Yep, its on!
Yep, our roof tiles are on! Twas a slow start to the week, nothing happening, then come Thursday, we had the eves being put in, which made us think that would be all we would be getting this week. Then this morning, we had a very nice surprise in the morning when Nat drove past and saw pallets of roof tiles and roofers on the roof! This afternoon saw our home with a roof full of tiles and only one row of capping left to do! Top effort! I'll be finding out on monday what Beechwood have planned for our house next week!
Saturday, August 20, 2011
Put a Fascia (and Gutter) to the name
Apologies for the delay in information in the last week. I have found myself in a new job more than an hour away from the build so I'm now unable to get day to day updates! Bummer I know, But here is the low-down on the happenings in the last week.
From my last post they have (almost) completed the bricking. I say almost as they actually ran out of bricks and are awaiting a shipment of one more pallet to finish the pillars in the garage. Aside from that it's all bricked up. The fascias and gutters were delivered and put on late last week and we have been told that the bricking will be completed at the begining of next week and that the tiles will be delivered and started next week also!
Hoping that this means that we're still on track for the end of November. Fingers crossed!
From my last post they have (almost) completed the bricking. I say almost as they actually ran out of bricks and are awaiting a shipment of one more pallet to finish the pillars in the garage. Aside from that it's all bricked up. The fascias and gutters were delivered and put on late last week and we have been told that the bricking will be completed at the begining of next week and that the tiles will be delivered and started next week also!
Hoping that this means that we're still on track for the end of November. Fingers crossed!
Wednesday, August 10, 2011
Would you like bricks with that?
BOOM! 1 day after the framing was complete we had bricks delivered and started. These photos are of 2 days work from our awesome "son of superman" brick layers! One half of the house is bricked up to the windows and the other side is up to the flashing. With another 2 days of solid bricklaying, we could potentially see 60% - 70% of our house bricked. Bring on more solid walls!
Thursday, August 4, 2011
Up up and away!
Well, isn't it just about time that our frames went up! From my count (and memory) I believe that is almost 3 weeks of waiting for these frames to create the very structure that will be our home. We had 3 false starts, 1 two weeks ago, 1 last week and 1 that was meant to be yesterday, but no, the carpenter got held up at another job, AGAIN! Finally though, we had 5 guys on our block first thing to whip up the frames, and whip up they did!
The house went from a slab with bundles of prebuilt frames to a shell of a house in about 9 hours. Halfway through that, I had rocked up to check it all out and ran into the supervisor whom is still confident in us receiving a christmas present from beechwood and that the bricking SHOULD begin at some stage next week! I will continue to have my fingers crossed there. Supervisor reckons that the framing should be finished saturday (if the guys work the saturday) if not monday so should have some finished product photos up then.
The house went from a slab with bundles of prebuilt frames to a shell of a house in about 9 hours. Halfway through that, I had rocked up to check it all out and ran into the supervisor whom is still confident in us receiving a christmas present from beechwood and that the bricking SHOULD begin at some stage next week! I will continue to have my fingers crossed there. Supervisor reckons that the framing should be finished saturday (if the guys work the saturday) if not monday so should have some finished product photos up then.
Subscribe to: